1. Transport the raw materials to the Hopper.
2. The raw materials will be fed into the Jaw crusher PE750X1060 for the first crushing evenly and continuously.
3. After crushing by the Jaw crusher, the discharged stones will be fed to the Impact CrusherPF1315 for secondary crushing.
4. After crushing by Impact CrusherPF1315, the discharged stones will be delivered to the Screen for separating. The stones bigger than 19 mm will return to Impact CrusherPF1315 for re-crushing. The stones smaller than 19 mm will be separated into 3 kinds of materials, 0-5 mm, 5-10 mm, and 10-19 mm.
The whole plant is a closed circle to make sure that all final products are qualified.